Funding narrative — Q2

v14

Program delivery — reporting period two

A. Point — confirm the allocation figure

Records/Funding

Locked for review — version history retained

what it covers

Choosing a participation structure.

Copper and critical minerals per megawatt, generation and interconnection, capital instruments, cooling and water design, the occupations an operating facility creates, and the participation models themselves. Six sub-modules, ending in a costed comparison of three structures on one project. Decommissioning liability is undisclosed in every Canadian project on the public record.

01

Calculate the material intensity

The copper and critical minerals a described facility consumes, and where the chain is open to participation.

02

Test the power plan

Whether a stated generation and interconnection plan is credible on the timeline given for it.

03

Screen the capital instruments

A project measured against loan guarantee and equity financing terms, and the ownership each one supports.

04

Compare the participation structures

Ground lease, equity, royalty, revenue share and procurement set against one project, decommissioning included.

the sub-modules

Sub-modules.

Each one stands alone: a cold open on a real document, five to eight minutes of teaching, one activity on your own material, and five graded items.

Critical minerals and material inputs

Copper intensity per megawatt, the storage metals, and the points in the chain open to participation.

Critical minerals and material inputs

Copper intensity per megawatt, the storage metals, and the points in the chain open to participation.

Generation, transmission, interconnection

Capacity against energy, queue mechanics, and whether a stated power plan is credible on its timeline.

Energy ownership and capital instruments

Loan guarantee capacity, provincial equity financing, and the ownership structure each one supports.

continued

Sub-modules, continued.

The last three sub-modules cover cooling, the occupations an operating facility creates, and the participation models themselves.

Allocations FY2026

Sheet 1

Programme

Budget

Committed

Housing

412,000

388,140

Lands & Resources

260,500

191,220

Health services

305,000

305,000

Education

178,400

96,850

Total

1,155,900

981,210

Figures drawn from live records — no re-entry

Cooling systems and water design

Air, rear-door, direct-to-chip and immersion, matched to a site’s water, climate and density constraints.

Occupations and workforce development

The roles that exist in an operating facility, the certifications each requires, and honest time to qualify.

Participation structures and revenue

Ground lease, equity, royalty, revenue share and procurement compared on one project, including who carries decommissioning.

The module artifact

A Participation Structure Comparison for a real or hypothetical project, with the three equity questions applied to each option.

the take away

What the learner keeps.

Every sub-module ends in a downloadable written to be usable by someone who has not taken the course.

Structure comparison

Three structures set against one project, with the three equity questions applied to each of them.

module artifact

Pathway map

Current community skills through to a named operating role, with credentials and honest timelines.

take away

Module credential

Sub-modules are individually completable and individually badged, and all ten modules make the credential.

badged